Clarkson 25/08/24 - Major Structural Defect - Incorrectly installed collar ties
- Brento Smith
- Aug 29, 2024
- 1 min read
TMT was contacted by a seller to repair collar ties that had been installed incorrectly. These were replaced with collar ties to satisfy Australian Standards.
All work was carried out to satisfy the report and a signed Statement of Completion was handed to the client for settlement.
Comentarios